Yancheng Lianggong Formwork Co., Ltd             +86-18201051212
You are here: Home » Solutions » How to ues Drophead Slab System-Reusable and Modular Slab Formwork?

How to ues Drophead Slab System-Reusable and Modular Slab Formwork?


Overview

Ever wished for a formwork system that feels more like Lego than heavy-duty labor? Enter Drophead Slab System – your secret weapon for fast, flexible, and frustration-free slab building. Whether you’re tackling high-rises, garages, or bridges, this modular system turns headaches into "hassle-free". Let’s dive into how to wield it like a pro!


1. Meet Your Team: Drophead Slab System’s Cool Components


  1. Drophead Slab System’s magic lies in its mix-and-match parts. Think of them as your slab-building superhero squad:


  • The Stars: Lightweight steel panels (like TF1812 – 1.8m x 1.2m, weighing just 44kg!) that snap together like puzzle pieces.


  • The Backbone: Telescoping props (SP series) that adjust from 2m to 3.5m. Perfect for quick height fixes!


  • Edge Warriors: Cantilever props (CP01/CP02) save the day at tricky overhangs.


  • Gap Guardians: Side fillers (SFB/SDB) ensure smooth edges, no concrete spills allowed!


   B. Pro Tip: Early stripping devices let you reuse panels faster – ideal for tight deadlines!


2. Pre-Game Prep: Set the Stage


  1. Before diving in, get your workspace game-ready:


  • Inventory Check: Count panels, props, and screws. Missing a piece? Better find it now!


  • Floor Talk: Clean the area and mark where panels will go. Imagine it’s a giant coloring book!


  • Safety First: Gear up with gloves and harnesses. Those guardrails? They’re your new BFFs.


3. Assembly Time: From Pieces to Perfection


  • Step 1: Prop it Up
    Adjust props to the right height using the nifty screw nuts. Pop on the drophead (DH01) and sub-drophead (DH02) for easy stripping later.


  • Step 2: Panel Party
    Use the Assistant Erection Tool (AET) – it’s like a forklift for your arms! Swing panels onto the props and lock them in place. No brute force needed!


  • Step 3: Edge Control
    For overhangs, attach the cantilever anchor (CA) to the beam, then clip on the CP01 prop. Add guardrails for that "I’m a safety superstar" vibe.


  • Step 4: Reinforcement Time
    Bolt on braces (BG18) and telescopic lintels (TB12) to keep everything rock-solid. Test a prop – if it wobbles, tweak it!


4. Pro Move: When Heights Get Crazy


  • If the slab’s taller than 5m, swap props for ringlock scaffolding. It’s like upgrading from a bike to a sports car – faster, safer, and way cooler.


5. Demolition Like a Champ


  • Once concrete’s set (usually 3-5 days), twist the drophead to release panels. Props stay put until the slab’s fully cured – patience, grasshopper!


6. Common Pitfalls to Dodge


  • Overloading: Don’t pile wet concrete like a buffet. Spread the love evenly!


  • Height Hacks: Never use regular props for over 5m. Ringlock or nothing!


  • Storage Smarts: Stack panels flat to avoid warping. Rust? Coat them with oil before storage.


7. Why Drophead Slab System Rocks Your Job Site


  • Speed Demon: 400㎡ per day for a 4-person crew? Yes, please!


  • Cost-Savvy: Reusable parts mean fewer trips to the dump.


  • Safety All-Star: Built-in rails and smart design = fewer accidents.


  • Ready to Level Up Your Slab Game?
    Drophead Slab System isn’t just a tool – it’s your shortcut to stress-free construction. Whether you’re a rookie or a vet, this system makes slabs easy, efficient, and even fun. Ready to see how it works for your next project?


  • Searching for "modular formwork " or "Drophead Slab System"? Check out Lianggong Formwork for top-quality gear and pro tips. Your future self (and your budget) will thank you!


Yancheng Lianggong Formwork Co., Ltd, founded in 2010, is a pioneer manufacturer mainly engaged in the production and sales of formwork & scaffolding.

Quick Links

Product Category

Get In Touch

Tel: +86-18201051212
Add:No.8 Shanghai Road, Jianhu Economic Development Zone,Yancheng City, Jiangsu Province, China
Leave a Message
Contact Us
 
Copryright © 2023 Yancheng Lianggong Formwork Co., Ltd. Technology by Leadong.Sitemap