Yancheng Lianggong Formwork Co., Ltd             +86-18201051212
You are here: Home » Solutions » How Did Our Company Excel in Bangladesh Hotel Project with Modular Formwork Solutions?

How Did Our Company Excel in Bangladesh Hotel Project with Modular Formwork Solutions?


I. Project Overview


(A) Project Background

  • We partnered with Bangladesh’s leading construction companies to build a five-star hotel complex in the heart of Dhaka. By blending advanced modular formwork technology with local needs, we’ve set new benchmarks for efficiency and sustainability in tropical construction.


(B) Key Project Details


  • Total Formwork Weight: About 670 tons

  • Shipping Plan: Custom container mix (standard + specialized crates)

  • Building Type: All-concrete structure poured on-site

  • Formwork Types: Standard steel frames for walls/columns + custom curved steel molds


II. Our Winning Formwork Systems

(A) Standard 65 Steel Frame Formwork Setup


1. What’s Inside


微信图片_20250306144526



Frame: Strong, rolled steel profiles

Panel: High-quality plywood with a waterproof plastic coat (industry-standard thickness)

Connections: Secure locking mechanism for easy, precise assembly






2. Why It Works


  • Handles heavy concrete loads without bending

  • Light enough to move easily but lasts 30+ uses

  • Mix-and-match parts for any wall or column size


(B) Custom Curved All Steel Formwork


1. Features


  • Full-steel design for long-term durability

  • Rust-resistant surface treatment

  • Precise manufacturing for perfect curved shapes


微信图片_20250306145809


2. Benefits


  • 40% faster installation for tricky designs

  • Smooth concrete finishes without extra work

  • 98% recyclable for eco-friendly building


III. Hassle-Free Shipping & Support

(A) Transportation Plan


  • Containers Used: Regular 20'/40' boxes + open-top crates for large curved molds

  • How We Sent It: Pre-assembled in stages to save time at the site

  • Protection: Steel supports and shock-absorbing materials to prevent damage


微信图片_20250306145816


(B) Quality & Service


  • Double Checks: Our own tests + independent certifications

  • On-Site Help: Expert team to guide installation

  • Quick Fixes: 24/7 phone line for immediate support


IV. Project Wins & New Ideas


(A) Key Results


  • Cost Down: 30% less spent by reusing materials

  • Time Up: Finished 40 days faster than old methods

  • Eco-Friendly: 98% recycling rate (beating industry norms)


(B) Cool Innovations


  • Mix & Match Design: 85% of parts work for walls and columns

  • Digital Planning: BIM models to catch issues before building

  • Green Tech: Water-based paints and energy-saving production


Ⅴ.Why Partner With Us?

We’re more than just formwork suppliers—we’re your construction allies. From factory to site, our solutions save time, cut costs, and deliver top-quality results.


Yancheng Lianggong Formwork Co., Ltd, founded in 2010, is a pioneer manufacturer mainly engaged in the production and sales of formwork & scaffolding.

Quick Links

Product Category

Get In Touch

Tel: +86-18201051212
Add:No.8 Shanghai Road, Jianhu Economic Development Zone,Yancheng City, Jiangsu Province, China
Leave a Message
Contact Us
 
Copryright © 2023 Yancheng Lianggong Formwork Co., Ltd. Technology by Leadong.Sitemap