How Simultaneous Wall-Slab Casting Accelerates Affordable Home Delivery
Breaking the Mold: What Makes Tunnel Formwork Essential for Modern Housing?
Lianggong's tunnel formwork system redefines modular construction through monolithic concrete casting - simultaneously forming walls and floor slabs in
one continuous pour. Unlike traditional methods requiring separate formwork stages, this system enables:
72-hour cycle times per housing unit (vs. 12+ days with conventional systems)
0.5mm/m vertical alignment precision across cast surfaces
400+ reuse cycles with Q355B steel construction
Core Component Evolution
Proprietary Features Driving Adoption:
Dual-phase stripping: Wall forms retract first, followed by ceiling components
Mobility package: Air-cushioned transporters enabling 15-minute unit relocation
Surface finish control: 3D-printed texture plates eliminating post-cast plastering
Dubai Case Study: 1,200 Units in 98 Days
Project: Nad Al Sheba Affordable Housing Complex
Challenge: Complete 50+ identical units/week in 45°C heat
Lianggong's Solution:
Deployed 12 tunnel formwork sets working in 3 shifts
Implemented "pour-move-pour" sequence with 8-hour cycles
Used phase-change concrete additives preventing rapid moisture loss
Results:
63 units completed weekly (26% above target)
0.3% concrete waste rate (industry avg: 6-8%)
98.4% dimensional compliance across all units
Economic Advantage: Cost Analysis per Housing Unit
Speed Bonus Calculation:
Early completion incentives ($28,000/day penalty avoidance) + accelerated progress payments
Climate-Smart Engineering: Desert-Proofing Modular Construction
Adaptations for Middle Eastern Conditions:
Thermal Management System
Active cooling channels maintaining 22-28°C curing environment
Ceramic-coated surfaces reflecting 92% solar radiation
Sand Mitigation Tech
Positive-pressure seals preventing particle ingress
Self-cleaning track systems removing abrasive residues
Cultural Customization
Pre-set openings for majlis seating niches
Adjustable module widths accommodating extended families
Quality Control: From Doha to Riyadh
Three-Stage Inspection Protocol:
1. Pre-Cast Verification
Laser-scanned alignment (±0.15mm tolerance)
250kN/m² pressure testing of all joints
2. Pour Monitoring
Real-time slump measurement via embedded sensors
Thermal imaging detecting cold joints
3. Post-Stripping Audit
3D photogrammetry comparing as-built vs BIM models
Schmidt hammer tests verifying 35MPa+ concrete strength
Riyadh Incident Resolution (2023):
Issue: Surface pitting in 14 units
Root Cause: Improper vibration frequency during 48°C pour
Fix: Implemented AI-driven vibration adjustment algorithm
The Road Ahead: What's Next in Tunnel Form Tech
Robotic Rebar Integration
Automatic reinforcement cage installation during form setup
Self-Healing Concrete Interface
Microcapsule technology repairing minor surface defects
Blockchain Tracking
Material traceability from steel mill to jobsite
4D Scheduling Integration
Real-time progress mapping against BIM timelines
Industry Endorsement
"Lianggong's system helped us achieve what local contractors deemed impossible - building quality homes faster than migrant worker camps."
– Khalid Al Maktoum, UAE Ministry of Housing Project Director