Yancheng Lianggong Formwork Co., Ltd. (“Lianggong”), a leader in China’s construction formwork and scaffolding field, operates a 1.2 million ㎡ intelligent production base in Jiangsu. With over 20 years focused on high-rise building formwork R&D, it offers three major systems—Horizontal, Vertical, and Super High-Rise—with 12 modular products. Serving 300+ high-rise projects nationwide , its formwork systems prioritize “standardized design, industrial production, and assembly construction” to tackle challenges like vertical transportation issues, tight schedules, and high-quality demands. Holding 17 national patents (including core technologies like hydraulic self-climbing formwork and early-dismantle supports), Lianggong sets industry standards.
2. Horizontal System: Efficient “Quick Form Removal” for Floor Slabs/Beams
Steel-frame plywood panel: high-strength steel frame + phenolic-faced plywood, ribbed design on all sides to boost deformation resistance by 30%.
Standard modules: 12 sizes (0.36–2.16㎡), like TF1812 (1800×1200mm) and TF0606 (600×600mm), ideal for irregular floor slab splicing.
Support Structure: Steel props with early-dismantle heads (SP series): Q355 inner tube + Q235 outer tube, height adjustable (2000–3500mm), with DH01 early-dismantle device for floors under 5 meters.
Ideal for floor pouring in high-rises, multi-story factories, and underground structures. After pouring, components reuse easily—lifted to higher floors without disassembly. Simpler in structure, easier to dismantle, and more reusable than traditional formwork.
Designed for slab concrete pouring in complex, narrow spaces. Supported by steel props/tripods with varied support heads, using H20 timber beams as primary/secondary beams, covered with panels. Works for clear heights up to 5.90m.
2.4 ALU-Drophead Slab Formwork
Material: aluminum alloy frame (18kg/m²) + aviation-grade aluminum plywood.
Highlights: Integrated early-dismantle head and aluminum frame, 40% lighter than steel formwork—perfect for super high-rise core-tube floors.
Certifications: Meets EU EN1237 standard, fire rating B-s1,d0 (critical for tunnel/high-rise fire safety).
3. Vertical System: Versatile Combinations for Wall Columns
3.1 65 Steel-Frame Wall Column Formwork
Specs: 65mm high steel frame + plywood, customizable size.
Use: Standard-story shear walls (20–50 floors), concrete surface flatness ≤2mm (no plastering needed).
Accessories: Quick-dismantle pins (10 seconds/piece), 3x faster than traditional bolts.
3.2Plastic Formwork (Round/Square Columns)
Material: Modified PP, single-section height 1.2–3m, spliceable into Φ300–Φ1200 round columns.
Advantages: Lightweight (8kg/m²), no release agent needed, mirror-level finish post-removal.
Lifespan: 50 uses, 20% cheaper than wood formwork.
3.3 Timber Beam System—Wall Column Formwork
Structure: C24 timber beams + 18mm WBP plywood, with adjustable braces for complex wall columns (e.g., inclined walls, variable-section columns).
Case: 45° inclined wall of Yangzhou’s 30-story Science and Innovation Center—adjusted via timber beams, error within ±5mm.
3.4 All-Steel Column Formwork (Round/Square Columns)
Tech: Block-type steel form + bolt locking, min. round column radius 300mm, max. square column 2m×2m.
Scene: Giant columns in super high-rise transfer floors (e.g., 1.8m×1.8m column at Wuhan’s 45-story Hang Lung Plaza), bearing 150kN/m².
Efficiency: Single column installed in <2 hours—50% faster than wood formwork.
4. Super High-Rise System: The “Intelligent Climber” for Core Tubes
4.1 Hydraulic Self-Climbing Formwork (HCB Series) Core Features:
Efficient & Safe: Fast climbing (5 days/floor avg.), stable operation, less tower crane reliance; robust safety barriers.
Economical & Convenient: No repeated disassembly—removed post-construction, saving space and reducing loss; minor errors, easily fixed floor by floor.
Intelligent Control: Electrically controlled hydraulic lifting system for high automation.
Types & Specs: - Types: HCB-100 & HCB-120, in diagonal brace type or truss type (composite/separate truss).
Specs: Load: Top platform ≤0.75kN/㎡, others ≤1kN/㎡.Hydraulics: Cylinder stroke 300mm, pump flow *n×2L/min (n = pumps), speed ~300mm/min.
Capacity: Rated thrust 1000kN & 1200kN.
Sync: Double-cylinder error ≤20mm.
5. Lianggong Quality and Service: From Product to Full Life-Cycle Support
5.1 Quality: Military-Grade Standards
Materials: Standard steel (10% higher yield strength) + US APA-certified (E-1 waterproof) plywood.
Testing: Third-party checks (e.g., SGS) ensure 12+ indicators (side pressure, deflection) exceed industry standards by 15%.
Case: Indonesia’s Jakarta-Bandung High-Speed Railway 20-story buildings—withstood tropical rain, zero deformation/leakage.
5.2 Service: Full Life-Cycle Coverage
Pre-sales: Free BIM design (3 solutions), e.g., Yancheng’s 38-floor landmark—previewed 200+ node collisions.
In-sales: 24/7 on-site engineers.
After-sales: Dedicated staff solve on-site issues promptly.
6. Conclusion: High-Rise Formwork—Modular, Intelligent, Labor-Efficient
Lianggong’s 4 systems and 12 products cover all high-rise construction stages. Whether the hydraulic self-climbing “sky builder” for core tubes or the early-dismantle table formwork for standard floors, it redefines construction with industrial logic.
In 2024, Lianggong’s projects cut time by 22% and labor costs by 35%, driving China’s construction toward “higher, faster, smarter” goals.