Delivery of Tunnel Formwork for Housing Projects

Tunnel Formwork For Housing is a specialized type of formwork used in constructing tunnel - like structures within buildings. In modern construction, it plays a pivotal role. By efficiently creating spatial structures that meet design requirements, it significantly enhances construction efficiency and quality, thus being widely adopted in large - scale residential construction projects.


Lianggong's Project in Uzbekistan


  • Project Location

The project is located in Uzbekistan, a Central Asian country. In recent years, Uzbekistan has made substantial investments in infrastructure construction, which has opened up vast opportunities for the development of the construction industry.

  • Project Formwork

The project employs tunnel formwork for housing. This type of formwork has been customized according to the local architectural style and engineering requirements. It is designed to adapt to the complex construction environment and meet high - standard construction quality demands.

  • Transportation Method

The transportation method chosen is road transportation. The formwork is first transported from Yancheng, Jiangsu Province, to Xinjiang. Yancheng, as one of Lianggong's production bases, is equipped with complete logistics facilities. After reaching Xinjiang, it is then transshipped to Uzbekistan. Xinjiang, as an important gateway for China's westward opening, has a convenient road transportation network connecting to Central Asian countries.

  • Transportation Tools

Flatbed trucks and high - sided trucks are selected as transportation tools. Flatbed trucks are suitable for loading large - sized and regularly - shaped formwork components. They can make full use of the truck's loading area and ensure the stability of the formwork during transportation. High - sided trucks are used to load some smaller but more numerous formwork accessories. Their high sideboards can effectively prevent the goods from falling during transportation.微信图片_20250218160110


Questions Regarding Delivery


  • Pre - installation of Products

To save transportation costs, for this project, the products are directly delivered without pre - installation. During transportation, pre - installed formwork would occupy more space, increase the number of transportation vehicles and the transportation mileage, thus significantly raising transportation costs. However, if the customer requests pre - installation for delivery, Lianggong will ship the products as per the customer's instructions. Lianggong always adheres to a customer - oriented approach and provides flexible solutions.

  • Quality Inspection before Shipment

The technical department first prepares a delivery list based on the vehicle's load capacity and type. This list is then sent to the company's follow - up department, and the follow - up staff forwards it to the quality inspection department and the warehouse shipping department. Only after the quality inspection department approves can the products be shipped. This rigorous process ensures that every shipped product meets the quality standards. The quality inspection department strictly tests multiple key indicators such as the formwork's dimensional accuracy, material strength, and welding quality, preventing unqualified products from entering the market.

  • Packaging of Products

The warehouse shipping department packages the goods based on the delivery drawings and actual conditions. During the packaging process, bundling, pallets, iron frames, or ton bags are selected according to the product profiles, weight, and volume to achieve optimal packaging and ensure the packaging is firm. For example, for some long and heavy formwork profiles, bundling is used, with high - strength ropes or steel straps tightly binding them together. For some small and easily scattered accessories, pallets or iron frames are used for packaging, which is convenient for handling and storage. For some powdered or granular auxiliary materials, ton bags are used for packaging, which not only ensures the tightness of the goods but also facilitates loading and unloading.

  • Identification of Products at the Project Site

For this project, the steel formwork components (such as roof panels, side panels, exterior walls, etc.) are all shipped in loose parts. Each part is numbered and painted according to the project drawings, and each part is also attached with a corresponding English shipping mark. The paint used for numbering and painting is highly weather - resistant, ensuring that the numbers remain clearly visible during long - distance transportation and in harsh construction environments. The English shipping mark clearly indicates key information such as the product name, specifications, and the part it belongs to. In addition, the company dispatches professional after - sales personnel to the project site to provide after - sales services, helping customers sort out the goods and guiding them in the installation work. The after - sales personnel have rich on - site experience and can quickly and accurately help local staff identify products and solve various problems encountered during installation.

  • Verification of Product Completeness

Lianggong's delivery process is highly standardized. From the technical department creating the delivery list to the follow - up department preparing the delivery list, the technical, warehouse, and follow - up departments jointly check the goods to ensure nothing is missed. The technical department makes a detailed delivery list according to project requirements and product characteristics, clarifying the specifications, quantity, and delivery requirements of each product. The follow - up department is responsible for reviewing and tracking the delivery list to ensure the smooth progress of the delivery process. The warehouse department sorts, packages, and ships the goods according to the delivery list and conducts a final check before shipment. Through the collaborative efforts of these three departments, problems such as incorrect or missing shipments are effectively avoided.

Conclusion

In Lianggong's housing tunnel formwork project in Uzbekistan, there is a rigorous and standardized process from formwork production, transportation to delivery. By reasonably choosing transportation methods and tools, strictly controlling product quality and delivery details, strong support is provided for the smooth implementation of the project. Whether it is the control of transportation costs, quality inspection, or the identification and verification of products, Lianggong provides comprehensive services to customers with a professional attitude and rich experience. In future projects, Lianggong will continue to uphold this rigorous work style, continuously optimize the delivery process, and provide global customers with higher - quality building formwork products and services.


Yancheng Lianggong Formwork Co., Ltd, founded in 2010, is a pioneer manufacturer mainly engaged in the production and sales of formwork & scaffolding.

Quick Links

Product Category

Get In Touch

Tel: +86-18201051212
Add:No.8 Shanghai Road, Jianhu Economic Development Zone,Yancheng City, Jiangsu Province, China
Leave a Message
Contact Us
 
Copryright © 2023 Yancheng Lianggong Formwork Co., Ltd. Technology by Leadong.Sitemap