Availability: | |
---|---|
Quantity: | |
LIANGGONG
Lianggong's H20 Timber Beam Slab Formwork is made of durable timber and features 1220x2440x18mm film-faced plywood formwork. It is designed to handle fresh concrete pressures up to 80kN/Sqm and can be customized to suit specific needs.
The formwork is suitable for a variety of applications, including warehouses, villas, dormitories and temporary offices. The system is easy to assemble and comes with the necessary supporting accessories.
The length of the formwork beams is customizable, ranging from 1000mm to 4000mm, and the width is from 200mm to 500mm. The height of the beam is 200mm and the chord width is 80mm (customizable).
The formwork is treated with waterproof phenolic WBP glue and painted yellow for water and corrosion resistance. It complies with international standards and is certified by ISO, CE, CARB and FSC, etc.
This formwork system is suitable for construction projects that require high strength and reliability. It is customizable in size and has a high production capacity of 2000 square meters per month.
Parameter | Value |
---|---|
Material | Wood |
Type | Column formwork |
Template | 1220x2440x18mm film-faced plywood |
Fresh Concrete Pressure | 80kN/Sqm (customizable) |
Application | Warehouses, Villas, Dormitories, Temporary Offices |
Packaging | Standard packaging |
Specification | Customizable |
Brand | LIANGGONG |
Origin | China |
Production Capacity | 2000 sqm per month |
Wood Type | Pine, Spruce, or customized |
Beam Height | 200mm (customizable) |
Beam Length | 1000mm ~ 4000mm |
Beam Width | 200mm ~ 500mm |
Chord Width | 80mm (customizable) |
Glue | Waterproof phenolic WBP |
Color | Yellow (Waterproof, Corrosion-resistant) |
Certification | ISO, CE, CARB, FSC |
Design Style | Modern |
Size | Customizable |
Features | Easy to assemble |
Surface Treatment | Special treatment |
Accessories | Supports |
Imported Spruce Flange: Made of high-quality imported spruce wood, finger-jointed to the web for added strength.
Plywood Web: The web is made of poplar core plywood, bonded with melamine WBP glue for excellent bonding.
Sealed Protective Cap: Each beam is equipped with sealed protective caps at both ends to prevent moisture damage and extend the life of the formwork.
Waterproof Yellow Coating: The formwork is coated with yellow waterproof paint for water resistance and corrosion resistance.
Flexible and Fast Formwork: Suitable for high-rise buildings, multi-story factories and underground structures, it is easy to assemble, disassemble and reuse compared to traditional systems.
Customizable wall formwork: wall formwork of any shape and size can be created with customizable thickness.
Surface material selection: allows selection of the best formwork surface material, such as a smooth concrete surface.
Adjustable beam and steel wall spacing: adjust the spacing according to concrete pressure requirements to optimize design and material cost-effectiveness.
Pre-assembly on site: pre-assembly on the construction site saves time, cost and space.
Compatible with European systems: compatible with most European formwork systems, flexible in construction.
Easy to reuse after pouring: after pouring, the platform can be lifted by a forklift and reused on the upper level without disassembly.
Simplified structure: compared with traditional systems, the platform has a simple structure, is easy to disassemble and reusable, speeds up construction and reduces labor costs.
High-rise buildings: Ideal for multi-story residential and commercial buildings.
Multi-story factories: Suitable for large factory construction that requires durable and flexible formwork.
Underground structures: Ideal for building underground facilities such as basements and subways.
Packing:
Wooden beams, steel brackets and tie rods are packed in bundles.
Small parts are bagged and placed on pallets.
Wooden box packaging is available upon customer request.
Irregular items are shipped in bulk in containers.
Delivery:
Production time: It usually takes 20-30 days to fully load a container, starting from receiving the customer's advance payment.
Shipping time: Depends on the destination port.
Special requirements must be discussed and agreed in advance.
Lianggong Construction All-steel Tunnel Formwork After-sales Service and Project Solutions.
Online Technical Support: Can answer any technical questions.
On-site Installation: Professional installation support at the construction site.
On-site Training: Provide training to ensure the correct use of the formwork.
On-site Inspection: Regular inspection to ensure system performance.
Free Spare Parts: Free spare parts for maintenance and repair.
Graphic Design: Customized layout design according to project requirements.
3D Model Design: Detailed 3D model for accurate project planning.
Complete Project Solutions: Comprehensive solutions from start to finish.
Cross-category Integration: Integration across different building elements for efficient project execution.
1. How long is the production lead time?
Full-box production usually takes 20-30 days, starting from receipt of advance payment.
2. What after-sales services are provided?
Lianggong provides online technical support, on-site installation, on-site training, on-site inspection and free spare parts.
3. Is the formwork compatible with other systems?
Yes, the formwork is compatible with most European formwork systems.
4. How does the formwork help improve construction efficiency?
The system is designed for rapid assembly and reusability, which reduces labor costs and speeds up the construction process.
5. Can you provide project solutions for my construction?
Yes, Lianggong provides 3D design models, graphic design and complete project solutions for efficient execution.
Lianggong's H20 Timber Beam Slab Formwork is made of durable timber and features 1220x2440x18mm film-faced plywood formwork. It is designed to handle fresh concrete pressures up to 80kN/Sqm and can be customized to suit specific needs.
The formwork is suitable for a variety of applications, including warehouses, villas, dormitories and temporary offices. The system is easy to assemble and comes with the necessary supporting accessories.
The length of the formwork beams is customizable, ranging from 1000mm to 4000mm, and the width is from 200mm to 500mm. The height of the beam is 200mm and the chord width is 80mm (customizable).
The formwork is treated with waterproof phenolic WBP glue and painted yellow for water and corrosion resistance. It complies with international standards and is certified by ISO, CE, CARB and FSC, etc.
This formwork system is suitable for construction projects that require high strength and reliability. It is customizable in size and has a high production capacity of 2000 square meters per month.
Parameter | Value |
---|---|
Material | Wood |
Type | Column formwork |
Template | 1220x2440x18mm film-faced plywood |
Fresh Concrete Pressure | 80kN/Sqm (customizable) |
Application | Warehouses, Villas, Dormitories, Temporary Offices |
Packaging | Standard packaging |
Specification | Customizable |
Brand | LIANGGONG |
Origin | China |
Production Capacity | 2000 sqm per month |
Wood Type | Pine, Spruce, or customized |
Beam Height | 200mm (customizable) |
Beam Length | 1000mm ~ 4000mm |
Beam Width | 200mm ~ 500mm |
Chord Width | 80mm (customizable) |
Glue | Waterproof phenolic WBP |
Color | Yellow (Waterproof, Corrosion-resistant) |
Certification | ISO, CE, CARB, FSC |
Design Style | Modern |
Size | Customizable |
Features | Easy to assemble |
Surface Treatment | Special treatment |
Accessories | Supports |
Imported Spruce Flange: Made of high-quality imported spruce wood, finger-jointed to the web for added strength.
Plywood Web: The web is made of poplar core plywood, bonded with melamine WBP glue for excellent bonding.
Sealed Protective Cap: Each beam is equipped with sealed protective caps at both ends to prevent moisture damage and extend the life of the formwork.
Waterproof Yellow Coating: The formwork is coated with yellow waterproof paint for water resistance and corrosion resistance.
Flexible and Fast Formwork: Suitable for high-rise buildings, multi-story factories and underground structures, it is easy to assemble, disassemble and reuse compared to traditional systems.
Customizable wall formwork: wall formwork of any shape and size can be created with customizable thickness.
Surface material selection: allows selection of the best formwork surface material, such as a smooth concrete surface.
Adjustable beam and steel wall spacing: adjust the spacing according to concrete pressure requirements to optimize design and material cost-effectiveness.
Pre-assembly on site: pre-assembly on the construction site saves time, cost and space.
Compatible with European systems: compatible with most European formwork systems, flexible in construction.
Easy to reuse after pouring: after pouring, the platform can be lifted by a forklift and reused on the upper level without disassembly.
Simplified structure: compared with traditional systems, the platform has a simple structure, is easy to disassemble and reusable, speeds up construction and reduces labor costs.
High-rise buildings: Ideal for multi-story residential and commercial buildings.
Multi-story factories: Suitable for large factory construction that requires durable and flexible formwork.
Underground structures: Ideal for building underground facilities such as basements and subways.
Packing:
Wooden beams, steel brackets and tie rods are packed in bundles.
Small parts are bagged and placed on pallets.
Wooden box packaging is available upon customer request.
Irregular items are shipped in bulk in containers.
Delivery:
Production time: It usually takes 20-30 days to fully load a container, starting from receiving the customer's advance payment.
Shipping time: Depends on the destination port.
Special requirements must be discussed and agreed in advance.
Lianggong Construction All-steel Tunnel Formwork After-sales Service and Project Solutions.
Online Technical Support: Can answer any technical questions.
On-site Installation: Professional installation support at the construction site.
On-site Training: Provide training to ensure the correct use of the formwork.
On-site Inspection: Regular inspection to ensure system performance.
Free Spare Parts: Free spare parts for maintenance and repair.
Graphic Design: Customized layout design according to project requirements.
3D Model Design: Detailed 3D model for accurate project planning.
Complete Project Solutions: Comprehensive solutions from start to finish.
Cross-category Integration: Integration across different building elements for efficient project execution.
1. How long is the production lead time?
Full-box production usually takes 20-30 days, starting from receipt of advance payment.
2. What after-sales services are provided?
Lianggong provides online technical support, on-site installation, on-site training, on-site inspection and free spare parts.
3. Is the formwork compatible with other systems?
Yes, the formwork is compatible with most European formwork systems.
4. How does the formwork help improve construction efficiency?
The system is designed for rapid assembly and reusability, which reduces labor costs and speeds up the construction process.
5. Can you provide project solutions for my construction?
Yes, Lianggong provides 3D design models, graphic design and complete project solutions for efficient execution.